- By Peter Šubert
- In News 2021
Construction of a new generation hospital Bory
The first hospital of the new generation of the World of Health network is currently growing in Bratislava’s Bory district.
It will include 14 operating rooms, a new generation emergency room, eight maternity rooms instead of boxes, a robotic medication preparation room, healthcare organized in multidisciplinary programs, innovative processes and modern radiodiagnostic equipment, a single standard for the patient or healing environment.
The rough construction of the hospital is currently completed. For its construction, the company Kranimex provided Liebherr tower cranes 2 x 112EC-H, 1 x 130EC-B, 1 x 185HC.
Photos from already completed construction :
Construction of the BORY HOME III residential area
A modern residential area Bory Home III is currently growing next to the new generation hospital. KRANIMEX used 7 Liebherr tower cranes for its construction.
An interesting combination of different types of tower cranes was created on the construction site – fast erecting cranes type K , flat top EC-B type cranes EC-B , classic cranes type EC-H and also previous generation type EC .
Configurations of mounted cranes :
Crane type |
71EC-B5 |
71EC-B5 |
71EC-B5 |
71 K |
71 EC |
71 K |
112 EC-H |
Height under the hook (m) |
30,3 |
39,8 |
39,8 |
27,9 |
40 |
27,9 |
40 |
Boom length (m) |
32,5 |
37,5 |
35 |
37 |
39,2 |
37 |
45 |
Base(m) |
3,8 x 3,8 |
3,8 x 3,8 |
3,8 x 3,8 |
4,5 x 4,7 |
3,8 x 3,8 |
4,5 x 4,7 |
4,6 x 4,6 |
Tower system |
63LC |
63LC |
63LC |
K |
71EC |
K |
120HC |
Photos from the ongoing construction :